AEROSPACE & DEFENSEAS9100D / Quality Management
Quality assurance manager
AS9100D requirements on audit date
An AS9100D quality audit requires evidence of what the quality management requirements looked like at a specific audit date. Use "As of Date" to reconstruct the entire baseline to the exact revision state on that date — no manual version reconstruction needed. Generate a Smart Report as the formal quality requirements snapshot submitted to the certification auditor.
MEDICAL DEVICESISO 14971 / Risk Management
Risk manager
ISO 14971 risk control version pinning
Risk control measure work items are updated during design reviews. Use Set Version to pin each risk control requirement to the specific revision formally reviewed and accepted by the risk management team. The baseline holds only the accepted revision of each risk control — not the current ADO state — providing the immutable risk management file reference for ISO 14971 compliance.
AUTOMOTIVEVDA 6.3 / Process Audit
Supplier quality engineer
VDA 6.3 process audit requirement reuse
A Tier-1 automotive supplier needs to share approved process audit requirements with a Tier-2 supplier's ADO project. Use Reuse Work Items to pull the approved VDA 6.3 process requirement set from the Tier-1 project into the Tier-2 project. The Tier-2 baseline's Details tab shows the Source Baseline confirming the origin — no manual copying and no traceability loss.
RAILWAYSEN 50657 / Rolling Stock Applications
Rolling stock systems engineer
EN 50657 rolling stock baseline copy
A train operator project needs the same EN 50657 rolling stock application requirements as the original OEM project. Use Copy Baseline to push the approved requirement set to the operator's ADO project with a project-specific prefix applied to all titles. The operator baseline's Details tab shows the Source Baseline — making the requirement origin immediately clear to the operator's engineering team.
PHARMACEUTICALICH Q9 / Quality Risk Management
Quality risk manager
ICH Q9 risk assessment rollback
A quality risk assessment document is modified after the formal QRM review closes — the risk severity classifications are changed without going through change control. Use Rollback to restore the affected work items to the exact revision captured in the post-review baseline. The rollback writes new ADO revisions providing a tamper-evident correction record for the ICH Q9 change control file.
BANKING & FINANCEBCBS 239 / Risk Data Aggregation
Risk data governance lead
BCBS 239 risk data query comparison
At each annual BCBS 239 assessment compare the current risk data aggregation requirements against the approved baseline using a saved ADO query as the comparison target. The Compare tab shows which requirements exist in the query but not in the baseline and vice versa — identifying any requirements added or removed outside the formal change control process.
GOVERNMENT & DEFENSENIST SP 800-171 / CUI Protection
Cybersecurity compliance engineer
NIST 800-171 CUI difference report
Between annual NIST SP 800-171 self-assessments, CUI protection requirements are updated to address new vulnerabilities. Create a Detailed Difference Report comparing this year's baseline to last year's. The report shows every field that changed in every CUI requirement — submitted to the Contracting Officer as formal evidence of what changed in the protection requirement set between assessment cycles.
DEFENSEDO-254 / Hardware Design Assurance
Hardware design assurance engineer
DO-254 hardware design summary report
At each DO-254 hardware lifecycle review — PHAC, HRR, HCR — generate a Summary Difference Report comparing the current hardware requirements baseline to the prior review baseline. The Summary Report provides a high-level change count — total items, changed and unchanged — submitted as formal DO-254 hardware design assurance evidence to the DER without requiring a field-level detailed review.
HEALTHCARE ITIEC 80001 / Medical Device Network Integration
Clinical IT integration engineer
IEC 80001 baseline from backlog
Before integrating a new medical device into the hospital network, right-click the selected IEC 80001 risk management work items in the ADO backlog and create a baseline directly — without navigating to the Baseline module. The baseline opens immediately with all selected integration requirement work items frozen at their current revision, ready to be used as the IEC 80001 risk management baseline for the integration project.
ENERGY & UTILITIESNERC CIP / Critical Infrastructure Protection
Grid security compliance lead
NERC CIP source and target traceability
A regional transmission operator creates a NERC CIP baseline and uses Copy Baseline to push it to three subsidiary utility projects. Each subsidiary baseline's Details tab shows the Source Baseline — confirming the requirements came from the RTO's approved set. The RTO's baseline Details tab shows all three subsidiaries in the Target Baselines section — providing complete cross-utility traceability in both directions.
ENTERPRISE SOFTWAREISO/IEC 29110 / Software Lifecycle
Software process manager
ISO 29110 Smart Docs baseline trigger
After completing the Software Requirements Specification in Smart Docs, click the Baseline option from the Smart Doc toolbar to create a baseline without navigating away. The baseline opens pre-loaded with all Smart Doc work items. This captures the formally agreed requirement set at project initiation as the ISO/IEC 29110 software lifecycle baseline — the reference point for all downstream design and test activities.
TELECOMETSI EN 300 175 / DECT Standard
Standards conformance engineer
ETSI baseline from approved review
After a formal review of the DECT conformance requirements closes in Review Management, create a baseline from the review using Existing Revisions of Approved Items Only. Only requirements that received formal sign-off are included in the baseline — requirements that were rejected or not actioned are excluded. The baseline becomes the approved ETSI conformance requirement set for the upcoming certification test cycle.